4 ms·
The 500M was for fixing up the eroding waterfront where they were building the campus. The alternative was allowing the damage to continue or fix it at a highe
by Velchronus 8y ago
The 500M was for fixing up the eroding waterfront where they were building the campus. The alternative was allowing the damage to continue or fix it at a higher price themselves.
- nihonde 8y agoI don’t want to pay for that either way. Let other developers do it. LIC is gentrifying anyway.