The major cost is land acquisition and infrastructure. Land is not cheap, and the US requires fair market compensation for such acquisition. And high speed rail
by bobthepanda 8y ago
The major cost is land acquisition and infrastructure. Land is not cheap, and the US requires fair market compensation for such acquisition. And high speed rail and other infrastructure projects of this kind tend to need land in areas that are typically more expensive (urban areas, developed areas around existing transport networks, etc.)
Elevated railways still need land purchasing for the land you're building on top of. Tunnels are way too expensive to be an alternative to surface construction even with land acquisition considered. And you need to punch through two mountain ranges, to get from SF to the Central Valley and then back to LA.
IIRC JR and TGV both expressed interest in a privately funded CAHSR, but balked at the Central Valley alignment.