4 ms·
Yeah. Caltrain electrification is desperately needed regardless of HSR and I hope it goes ahead even with this. The current timetable is not frequent enough (I
by martinald 8y ago
Yeah. Caltrain electrification is desperately needed regardless of HSR and I hope it goes ahead even with this. The current timetable is not frequent enough (I believe they were targeting 6 trains an hour each way with the electrification) and is very slow.