4 ms·
Look up how much it costs to build a mile of highway. On level ground, in undeveloped areas it's still amazingly expensive. Now try to build something through
by hinkley 8y ago
Look up how much it costs to build a mile of highway. On level ground, in undeveloped areas it's still amazingly expensive.
Now try to build something through developed areas, maybe not at grade, and dealing with traffic rerouting, other infrastructure interruptions, and NIMBYism.
- bilbo0s 8y ago>maybe not at grade... I know I'm not from Cali or anything, but it's actually quite a bit worse than that. In California I'm almost positive it would require some tunneling. And not the easy kind of tunneling that you might see in, say, western North Carolina, asheville area. No. I'm talking about the hard kind that has to keep globally significant fault lines and seismic activity in mind.
- hinkley 8y agoWell, there's a tendency when lambasting big infrastructure projects like this to compare one city's efforts to those done elsewhere, and if Japan can keep trains on tracks through an earthquake then you have to dig into the numbers for both and ask if they had the same problem. And if so, should hindsight from the earlier project have informed the plans for later one. There's also a tendency in big projects to be intentionally obtuse, come up with a number that the customers (tax payers) won't riot over, and then rely on sunk cost and other fallacies to let the project expand to its real size later on.
- rbritton 8y agoDoes California have something like the following? It could explain some of the cost. In Washington state we have laws that require workers to be paid Prevailing Wage, the premise of which is that working in a county pays the corresponding wage for a position based on the largest city in that county. The reality is often that the wage set is significantly higher than the true market wage, which causes costs to ramp up quickly. http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/def...
- gwright 8y agoFor projects with federal funding, look at the Davis Bacon Act: https://en.wikipedia.org/wiki/Davis–Bacon_Act_of_1931 https://en.wikipedia.org/wiki/Davis–Bacon_Act_of_1931
- WillPostForFood 8y agoOf course California has a prevailing wage law. https://www.dir.ca.gov/Public-Works/Prevailing-Wage.html https://www.dir.ca.gov/Public-Works/Prevailing-Wage.html
- abugheratwork 8y agoThat won't "ramp up" costs unless the initial estimate for the costs included wrong numbers for labor. Ramp up from what? An uninformed guess?
- bobthepanda 8y ago> The reality is often that the wage set is significantly higher than the true market wage, which causes costs to ramp up quickly. Do you have a source for this assertion?
- bobthepanda 8y agoThe major cost is land acquisition and infrastructure. Land is not cheap, and the US requires fair market compensation for such acquisition. And high speed rail and other infrastructure projects of this kind tend to need land in areas that are typically more expensive (urban areas, developed areas around existing transport networks, etc.) Elevated railways still need land purchasing for the land you're building on top of. Tunnels are way too expensive to be an alternative to surface construction even with land acquisition considered. And you need to punch through two mountain ranges, to get from SF to the Central Valley and then back to LA. IIRC JR and TGV both expressed interest in a privately funded CAHSR, but balked at the Central Valley alignment.