3 ms·
It runs up the existing Caltrain route to King St. and later to the new inconceivably badly conceived bus station they built downtown via a curvy slow tunnel un
by erentz 8y ago
It runs up the existing Caltrain route to King St. and later to the new inconceivably badly conceived bus station they built downtown via a curvy slow tunnel under the streets.
- martinald 8y agoYeah. Caltrain electrification is desperately needed regardless of HSR and I hope it goes ahead even with this. The current timetable is not frequent enough (I believe they were targeting 6 trains an hour each way with the electrification) and is very slow.
- Animats 8y agoA desperate attempt to save the real estate value of the existing "downtown" from the general move of "downtown" southward to SOMA and Mission Bay.