3 ms·
The B-52 program is slated to have a 95 year operational time span. Partly as an experiment in maintaining old aircraft.
by kevin_thibedeau 8y ago
The B-52 program is slated to have a 95 year operational time span. Partly as an experiment in maintaining old aircraft.
- cstross 8y agoYes, but Boeing built 744 of the things, and only 78 (or fewer) are still in USAF service (I believe NASA has one …). So the ones being upgraded are from a late production batch (the B-52H) and presumably by that point Boeing had standardized things properly. Comet production ran to 114 aircraft in four major versions, of significantly different size and engine configuration (they started with a 36 seater, and ended up with 119 passengers in a charter-variant of the Comet 4C). No individual model of Comet got anywhere close to a triple-digit production run. Oh, and 26 hull loss accidents!