2 ms·
how such high numbers at the top level could co-exist with much lower and more realistic reliability estimate by the engineers working on the project. "The The
by stcredzero 8y ago
how such high numbers at the top level could co-exist with much lower and more realistic reliability estimate by the engineers working on the project.
"The Thermocline of Truth." In a big enough company, there is a layer that bad news has trouble getting past.
http://brucefwebster.com/2008/04/15/the-wetware-crisis-the-themocline-of-truth/ http://brucefwebster.com/2008/04/15/the-wetware-crisis-the-t...