3 ms·
Yup. I've worked on projects where there were 6-7 major branches active at the same time and several smaller ones, besides the master branch. Then you'd have to
by oblio 8y ago
Yup. I've worked on projects where there were 6-7 major branches active at the same time and several smaller ones, besides the master branch. Then you'd have to merge everywhere applicable, etc.
Totally different from the Google monorepo approach of "master only", basically. And probably one of the main reasons why Golang is having a ton of difficulties in the outside world by not having a proper versioning story.
- deleted 8y ago[deleted]