Construction cost of ITER is very high, but these new designs use new superconductors and are ten times smaller for the same output (500MW). The JET reactor in
by DennisP 8y ago
Construction cost of ITER is very high, but these new designs use new superconductors and are ten times smaller for the same output (500MW). The JET reactor in the U.K. is about the same size, and was built in four years for half a billion dollars. That's without the facilities to actually extract electricity, but it's also a one-of-a-kind experimental device and you get economies of scale by producing lots of them in factories (which we could do, since it's not that big).
So a billion dollars a gigawatt seems about the right order of magnitude, and that's comparable to power sources we use today.
- pfdietz 8y agoSo that goes from being 400x worse than a PWR to only being 40x worse (metric: power density of the primary reactor vessel). It's still not going to be competitive.