3 ms·
So the plan is to leave the unused cabling in the tunnel and plaster some new stuff further up the wall? I hope that there is a robust plan in place to deal wi
by cco 8y ago
So the plan is to leave the unused cabling in the tunnel and plaster some new stuff further up the wall?
I hope that there is a robust plan in place to deal with the old cabling which will continue to rot and at some point will detach leading to blocked tracks or possible train damage.
- DontGiveTwoFlux 8y agoApparently they will add sensors to continuously monitor the concrete for failures.