4 ms·
Shifting power east / west is another option. Supplying Florida with solar from California can significantly reduce the need for storage. This also allows you
by Retric 8y ago
Shifting power east / west is another option. Supplying Florida with solar from California can significantly reduce the need for storage. This also allows you to supply morning power in California with solar in Florida.
The interactions are complex enough I think production, transmission, and storage all need to be dealt with separately.
- philipkglass 8y agoLong-distance grid connections are technically viable and can reduce the need for storage. The biggest problem in the US is the very slow and uncertain process of getting state-by-state approval for interstate transmission projects. A Florida-California transmission project would need approval from at least 8 states. The proposed Grain Belt Express transmission project goes through only 3 states and received its first approval (in Kansas) 7 years ago. It is still trying to get the necessary approvals in Missouri. Due to this drawn-out process in Missouri, opponents in Illinois were able to reverse the project's earlier-obtained Certificate of Public Convenience and Necessity. Even if Missouri gets on board the project will have to re-obtain approval in Illinois, and perhaps by the time that's over Kansans will have new objections.
- cure 8y agoThere is a long-distance transmission line in California that is used a bit like this, allowing the use of power from the North in the South in summer when peak demand is there, see https://en.wikipedia.org/wiki/Pacific_DC_Intertie https://en.wikipedia.org/wiki/Pacific_DC_Intertie The Pacific DC Intertie is not nearly as long as a connection between CA and FL would be. In that scenario, transmission losses would be quite significant. The cost of building and maintaining the line would also be quite high.
- eigenvector 8y agoAlthough transmission does help alleviate the problem, the nature of building new linear infrastructure is that it will take much more time and risk to complete a transmission megaproject than to simply build more storage where it's needed.