3 ms·
I find that interesting because every time I hear "Grumman" I think of the big brouhaha in the 1980's in New York City. The MTA ordered dozens? hundreds? of ne
by reaperducer 8y ago
I find that interesting because every time I hear "Grumman" I think of the big brouhaha in the 1980's in New York City. The MTA ordered dozens? hundreds? of new "flexible buses" from Grumman and within months they all cracked down the middle. There was a transit shortage while the buses were sent out to Long Island to be repaired.
It was a very long time ago, and Google fails me right now, so I'm not sure what the exact problem was, or what exactly a "flexible bus" meant. The only thing I can think of is that was the term of the day for articulated bus.
- johnmaguire2013 8y agohttps://en.wikipedia.org/wiki/Flxible_Metro https://en.wikipedia.org/wiki/Flxible_Metro
- reaperducer 8y agoThanks for that. Here's the relevant paragraph: The Metropolitan Transportation Authority (MTA), in whose buses where the first cracked A-frame problem was noticed in early December 1980 at their Ulmer Park Depot, yanked its NYC Transit Authority fleet for the first time in 1980 (a separate batch for MSBA was built with the problem rectified the next year) and sued Grumman. This lawsuit would result in a settlement to fix all 870 buses built until that time (2,656 examples in all), along with an early termination of the build contract where the final 200 buses of the order were transferred to General Motors.