10 ms·
I don't track it, but last I heard there was a proposal that would cost ~$100M to drive micropilons down to bedrock, which is what should have been mandated in
by cronix 8y ago
I don't track it, but last I heard there was a proposal that would cost ~$100M to drive micropilons down to bedrock, which is what should have been mandated in the main design to begin with. https://www.sfchronicle.com/bayarea/article/Millennium-Tower-homeowners-propose-100-million-13440479.php https://www.sfchronicle.com/bayarea/article/Millennium-Tower...
Some windows are starting to crack as well. https://sf.curbed.com/2018/9/7/17829328/millennium-tower-window-crack-highrise https://sf.curbed.com/2018/9/7/17829328/millennium-tower-win...
- HillaryBriss 8y agoI recall early stories about Millennium Tower and the builder basically claiming, through a law firm, that it was a normal amount of settling and everything was fine. Nothing to see here.... And I bet the same sort of response will come from the builder of Opal Tower in Sydney.
- twblalock 8y agoThat's always how it starts, and it always ends with the developer, architect, builder, residents, and local government suing each other for years on end.
- samstave 8y agoHere is my personal opinion on the reason why it was thought to be a reasonable amount of settling: that they were looking at simply the individual millenium towers' effect on the overall area -- but with the addition of the transbay terminal next door - the major excavation which occured with that - then the new load of the salesforce tower and the transbay terminal (which also had been closed due to cracking and settling issues and needs to be jacked up -- I think that whole lot of struct/civ engineers are at fault of being short-sighted about the surrounding load impact on the greater financial district and the standards which were previously thought to be adequate. So - you have the millenium tower, which was completed prior to any of these ancillary loads were put on the area - but is effectively being squeezed out and squished, and even the most micro-shifts in the foundations of Millenium Tower will be amplified by its mass+height -- but as it was already into a settled-ish position, its now getting worse after its' settling is further distressed due to even a millimeter shift in the lateral load due to compression from and settling of the new towers/terminal....
- TheGrassyKnoll 8y agoMillennium Tower will be a multi-decade lawyer-fest. At least four or five parties will be suing each other: The designers, the builders, the city, the apartment owners, insurance companies and probably the neighboring building owners. What a mess.
- sagarm 8y agoThe window crack discovered in September is believed to be caused by an external impact: https://www.sfchronicle.com/bayarea/article/Something-hit-Millennium-Tower-and-cracked-window-13276821.php https://www.sfchronicle.com/bayarea/article/Something-hit-Mi... There was another one discovered in late October, but I haven't seen any updates on that one.