3 ms·
This is nothing compared to the estimated $3.5 billion to redirect the tracks underground in San Diego. Coastal bluff failures are occurring within several feet
by calebsurfs 8y ago
This is nothing compared to the estimated $3.5 billion to redirect the tracks underground in San Diego. Coastal bluff failures are occurring within several feet of the tracks on a regular basis. I spend time at this beach and I don't know how this track will be viable in a couple years, with or without rising sea levels. Once it is deemed unsafe, San Diego will be completely cut off by rail.
https://www.latimes.com/local/lanow/la-me-ln-sd-del-mar-bluffs-20181216-story.html https://www.latimes.com/local/lanow/la-me-ln-sd-del-mar-bluf...
- CalRobert 8y agoGiven HN's general policy of disallowing paywalled links maybe we should also consider disalling GDPR-walled links. Sure, proxies and VPN's exist but it's a PITA just to read an LATimes article. And SD will still have the trolley from TJ at least.