4 ms·
I actually suspect these attempts at material savings are one of the things leading to ballooning costs. Spending 200 engineering hours to cut $5k worth of stee
by tomatotomato37 8y ago
I actually suspect these attempts at material savings are one of the things leading to ballooning costs. Spending 200 engineering hours to cut $5k worth of steel is still a net loss.