7 ms·
The whole contract was actually £1.36bn over 10 years (NAO report, p.2), and the £113m covered the new online recruitment system (including the costs of running
by pmyteh 8y ago
The whole contract was actually £1.36bn over 10 years (NAO report, p.2), and the £113m covered the new online recruitment system (including the costs of running the old system longer than expected) and was triple the budget (p.6).