3 ms·
Quite the opposite of cost saving, the Transit Center was a test of cutting-edge, unproven structural engineering. If they wanted it cheap, they could have buil
by closeparen 8y ago
Quite the opposite of cost saving, the Transit Center was a test of cutting-edge, unproven structural engineering. If they wanted it cheap, they could have built a much simpler building.