3 ms·
> I assume most of the saving is from grid stabilisation, rather than supplying/storing energy but still. Yes, the entire reported savings was by avoiding buil
by neolefty 8y ago
> I assume most of the saving is from grid stabilisation, rather than supplying/storing energy but still.
Yes, the entire reported savings was by avoiding building a fast-response generator, which would cost tens of millions to maintain each year.
From the article:
> Has contributed to the removal of the requirement for a 35 MW local Frequency Control Ancillary Service (FCAS), saving nearly $40 million per year in typical annual costs
The article several includes other significant benefits as well that aren't even included in the $40 million.