3 ms·
I would be surprised if they launch many of the satellites on customer launches. They have some very specific orbits, and are planning on dropping the satellite
by Rebelgecko 8y ago
I would be surprised if they launch many of the satellites on customer launches. They have some very specific orbits, and are planning on dropping the satellites off in orbits much lower than where they will actually be operating. It would probably be more fuel efficient to drop off a bunch of them in the right inclination all at once, then boost them up into spaced out orbits.
- toomuchtodo 8y agoIt's possible that they will use reflown Falcon 9s that have exceeded their reuse capability (~10 launches) to deliver these satellites. You're only paying for the propellant, the oxidizer, the second stage, and your fixed operations cost; the rest of the vehicle has been amortized through paying customer flights.
- soperj 8y agoThey only reuse the first stage at this point, so still a lot of cost there.