3 ms·
Additional details in this GTM story: https://www.greentechmedia.com/articles/read/pges-recording-breaking-battery-proposal-wins-loses https://www.greentechmedi
by philipkglass 8y ago
Additional details in this GTM story: https://www.greentechmedia.com/articles/read/pges-recording-breaking-battery-proposal-wins-loses https://www.greentechmedia.com/articles/read/pges-recording-...
...four projects, totaling 567.5 megawatts/2,270 megawatt-hours, to go into the transmission-constrained Moss Landing area south of the San Francisco Bay.
The portfolio includes a 300-megawatt/1,200-megawatt-hour system that Vistra Energy would build in an existing power plant owned by its subsidiary Dynegy, as well as a 182.5-megawatt/730-megawatt-hour Tesla system that PG&E would own at a substation nearby.
This is a lot of capacity and storage compared to recent projects. The Hornsdale Power Reserve that Tesla installed in South Australia last year is "only" 100 MW/129 MWh.
- Gibbon1 8y ago> This is a lot of capacity and storage compared to recent projects. California's policy makers and utilities are all in at this point.