4 ms·
A simple timer isn't enough. You would want the chargers to be networked, so that the power company can optimize the load. That's not impossible, but it also do
by skgoa 8y ago
A simple timer isn't enough. You would want the chargers to be networked, so that the power company can optimize the load. That's not impossible, but it also doesn't exist, yet.
- robjan 8y agoThe UK power grid (which this article is talking about) is being converted to a smart grid. All new electric meters report their usage continuously which can be used to discover usage patterns. I imagine that chargers would also be connected to smart meters.
- makomk 8y agoAs it currently stands, most of the installed base of smart meters can't even communicate to electricity companies other than the one that originally installed them, so I'd say that's a long way off.