4 ms·
No need for a separate grid to deliver high voltage even in rural areas, the overhead or underground wires are between 4KV to 30KV anyway. There is a transforme
by davidgould 8y ago
No need for a separate grid to deliver high voltage even in rural areas, the overhead or underground wires are between 4KV to 30KV anyway. There is a transformer to step it down to the end use voltage, whatever that is, eg 240 or 400.