4 ms·
The person I was replying to specifically said "pay to an engineer". That is not the fully-loaded cost.
by vonmoltke 8y ago
The person I was replying to specifically said "pay to an engineer". That is not the fully-loaded cost.
- shard 8y agoThe person he was replying to was talking about cost to design the chip, which would imply employer costs. The error has to stop somewhere.