4 ms·
the (old) Bay Bridge serviced trains until the 1960s. perhaps the design had higher loads & structural requirements due to that use.
by jakelarkin 8y ago
the (old) Bay Bridge serviced trains until the 1960s. perhaps the design had higher loads & structural requirements due to that use.