A manager went to the Master Programmer and showed him the requirements document for a new application. The manager asked the Master: "How long will it take to
by kornakiewicz 8y ago
A manager went to the Master Programmer and showed him the requirements document for a new application. The manager asked the Master: "How long will it take to design this system if I assign five programmers to it?"
"It will take one year," said the Master promptly.
"But we need this system immediately or even sooner! How long will it take if I assign ten programmers to it?"
The Master Programmer frowned. "In that case, it will take two years."
"And what if I assign a hundred programmers to it?"
The Master Programmer shrugged. "Then the design will never be completed," he said.
- Tade0 8y agoRecently I had a chance to quote this Koan explaining why I think a certain project went way over its original budget.
- wool_gather 8y agoTo management? I'd be very interested to hear how that went over.
- Tade0 8y agoFortunately not exactly. It was such a massive project that everyone from my current team touched (or actually was touched by) it - including our current tech lead who had the misfortune of being assigned there briefly. The topic came up on one of the introductory meetings and we shared our respective theories. My take was that had this project had half the staff, it would take half the time to complete. All and all there were over twenty people there doing daily standups.
- dexen 8y agoA great koan, thank you. There's also a related, from-the-trenches, story: It is a very humbling experience to make a multimillion-dollar mistake, but it is also very memorable. I vividly recall the night we decided how to organize the actual writing of external specifications for OS/360. The manager of architecture, the manager of control program implementation, and I were threshing out the plan, schedule, and division of responsibilities. The architecture manager had 10 good men. He asserted that they could write the specifications and do it right. It would take ten months, three more than the schedule allowed. The control program manager had 150 men. He asserted that they could prepare the specifications, with the architecture team coordinating; it would be well-done and practical, and he could do it on schedule. Futhermore, if the architecture team did it, his 150 men would sit twiddling their thumbs for ten months. To this the architecture manager responded that if I gave the control program team the responsibility, the result would not in fact be on time, but would also be three months late, and of much lower quality. I did, and it was. He was right on both counts. Moreover, the lack of conceptual integrity made the system far more costly to build and change, and I would estimate that it added a year to debugging time. -- Frederick Brooks Jr., "The Mythical Man Month"
- fjsolwmv 8y agoThat sounds specious - grass is greener fallacy. The evidence was that the CP team failed at the job. But where is the evidence that the architecture team would succeed? The general suspicion of TMMM is that it extrapolates from failure but assumes that some untried else would be better.
- loup-vaillant 8y agoFred Brooks probably had reasons to think the untried else would have been better. His experience, hindsight from later cases, and also the architecture manager's predictions, which did turn out correct. When someone makes three predictions, two turn out to be correct, and the third ended up not tried, we would do well to think twice before dismissing that third prediction.
- stephengillie 8y agoWhy didn't he work internally to prevent these issues? It sounds like he was pleased to let them fail, so he could be correct with no effort. Why are we taking advice from someone who lets others fail so he and his team look better? This kind of internal competition destroyed Motorola and damages many other organizations.
- loup-vaillant 8y ago> Why didn't he work internally to prevent these issues? What makes you think he didn't? > Why are we taking advice from someone who lets others fail so he and his team look better? From the quote, Fred brooks was clearly the boss of both the architecture manager and the control program manager. He wasn't part of any one team. I don't see the kind of conflict of interest you're hinting at. > It sounds like he was pleased to let them fail, so he could be correct with no effort. To me, it sounds like he simply made a bad call, and was saying "oops".
- coldtea 8y ago>That sounds specious - grass is greener fallacy. The evidence was that the CP team failed at the job. But where is the evidence that the architecture team would succeed? Anybody who has worked for a couple of decades of large software project, doesn't need any, cause they have seen this play out time and again. Brooks doubly so -- he literally wrote the book on software development timelines. Sure, technically you're right. But it's not like every piece knowledge needs to come packaged in a fancy LaTeX, with confidence intervals, and control groups. Sometimes experience alone is enough to assure us that the rain is wet and that a team of 150 will invariably fail in this way when assigned such a task compared to a team of 10.
- afwjaeif 8y agoLooks like this was taken from one of those super recompressed images from Indian programming groups on Facebook.
- kornakiewicz 8y agoIt's older than facebook, JPG and the idea of hiring programmers in India (1987). http://www.mit.edu/~xela/tao.html http://www.mit.edu/~xela/tao.html
- wallflower 8y agoManagement at one of my companies actually used this metaphor (expressed as below), along with another favorite: "If you put lipstick on a pig, it is still a pig." "If it takes nine months for a woman to deliver a baby, getting nine women will not deliver a baby in one month."
- close04 8y agoThat's the famous definition of a project manager :). The person who thinks that if a woman can deliver a baby in 9 months then 9 women should be able to do it in 1. It's the "throw more men at it" strategy.
- bckmn 8y agoYears ago, an investor and I had about the same conversation. He was adamant about needing a spreadsheet that would allow him to model hires vs. cost vs. time. I built a calculator that models that koan: https://www.andjosh.com/hard-numbers/ https://www.andjosh.com/hard-numbers/
- watwut 8y agoThen again, the master programmer could have assign 5 people to this project and other 5 to different tasks (hello more detailed tests or research frameworks or even another team doing the same task independently) finishing the whole thing in one year with those 10 people. So maybe it is more story about how we fail when we think about organization and negotiation. (The master programmer making sure estimate so easily suggest they won't be at time anyway).
- stephengillie 8y agoThe Master persists in smug obtuseness while forcing the manager to play games - which usually leads to an unemployed Master.