- kornakiewicz 8y agoA manager went to the Master Programmer and showed him the requirements document for a new application. The manager asked the Master: "How long will it take to design this system if I assign five programmers to it?" "It will take one year," said the Master promptly. "But we need this system immediately or even sooner! How long will it take if I assign ten programmers to it?" The Master Programmer frowned. "In that case, it will take two years." "And what if I assign a hundred programmers to it?" The Master Programmer shrugged. "Then the design will never be completed," he said.
- Tade0 8y agoRecently I had a chance to quote this Koan explaining why I think a certain project went way over its original budget.
- wool_gather 8y agoTo management? I'd be very interested to hear how that went over.
- Tade0 8y agoFortunately not exactly. It was such a massive project that everyone from my current team touched (or actually was touched by) it - including our current tech lead who had the misfortune of being assigned there briefly. The topic came up on one of the introductory meetings and we shared our respective theories. My take was that had this project had half the staff, it would take half the time to complete. All and all there were over twenty people there doing daily standups.
- dexen 8y agoA great koan, thank you. There's also a related, from-the-trenches, story: It is a very humbling experience to make a multimillion-dollar mistake, but it is also very memorable. I vividly recall the night we decided how to organize the actual writing of external specifications for OS/360. The manager of architecture, the manager of control program implementation, and I were threshing out the plan, schedule, and division of responsibilities. The architecture manager had 10 good men. He asserted that they could write the specifications and do it right. It would take ten months, three more than the schedule allowed. The control program manager had 150 men. He asserted that they could prepare the specifications, with the architecture team coordinating; it would be well-done and practical, and he could do it on schedule. Futhermore, if the architecture team did it, his 150 men would sit twiddling their thumbs for ten months. To this the architecture manager responded that if I gave the control program team the responsibility, the result would not in fact be on time, but would also be three months late, and of much lower quality. I did, and it was. He was right on both counts. Moreover, the lack of conceptual integrity made the system far more costly to build and change, and I would estimate that it added a year to debugging time. -- Frederick Brooks Jr., "The Mythical Man Month"
- fjsolwmv 8y agoThat sounds specious - grass is greener fallacy. The evidence was that the CP team failed at the job. But where is the evidence that the architecture team would succeed? The general suspicion of TMMM is that it extrapolates from failure but assumes that some untried else would be better.
- loup-vaillant 8y agoFred Brooks probably had reasons to think the untried else would have been better. His experience, hindsight from later cases, and also the architecture manager's predictions, which did turn out correct. When someone makes three predictions, two turn out to be correct, and the third ended up not tried, we would do well to think twice before dismissing that third prediction.
- 8y ago
- afwjaeif 8y agoLooks like this was taken from one of those super recompressed images from Indian programming groups on Facebook.
- kornakiewicz 8y agoIt's older than facebook, JPG and the idea of hiring programmers in India (1987). http://www.mit.edu/~xela/tao.html http://www.mit.edu/~xela/tao.html
- wallflower 8y agoManagement at one of my companies actually used this metaphor (expressed as below), along with another favorite: "If you put lipstick on a pig, it is still a pig." "If it takes nine months for a woman to deliver a baby, getting nine women will not deliver a baby in one month."
- close04 8y agoThat's the famous definition of a project manager :). The person who thinks that if a woman can deliver a baby in 9 months then 9 women should be able to do it in 1. It's the "throw more men at it" strategy.
- bckmn 8y agoYears ago, an investor and I had about the same conversation. He was adamant about needing a spreadsheet that would allow him to model hires vs. cost vs. time. I built a calculator that models that koan: https://www.andjosh.com/hard-numbers/ https://www.andjosh.com/hard-numbers/
- watwut 8y agoThen again, the master programmer could have assign 5 people to this project and other 5 to different tasks (hello more detailed tests or research frameworks or even another team doing the same task independently) finishing the whole thing in one year with those 10 people. So maybe it is more story about how we fail when we think about organization and negotiation. (The master programmer making sure estimate so easily suggest they won't be at time anyway).
- stephengillie 8y agoThe Master persists in smug obtuseness while forcing the manager to play games - which usually leads to an unemployed Master.
- js8 8y agoI like the article. I think, in general, (project) management could learn a lot from computer science. People working on operating systems etc. figured out solutions to a lot of problems like scheduling and so on. Another similar penalty with humans that is often ignored is caching of skills into working memory. For example, consider a process, like writing an expense, that is really simple. Because it's simple, it might be tempting not have a specialized person do it and instead having every person do it on the need basis. But then, if it's done only rarely, people will have to learn it each time, or ask somebody how to do it, spending lot more time on it due to what are pretty much cache misses, and it would be more efficient to have a specialist do it, because then he would do it every day and had all the process corner cases in working memory. Similar problem with caching happens when say a programmer multitasks on several different things at a time. In that case, the cache (working memory) is completely trashed every time a task is switched.
- dasmoth 8y agoFor example, consider a process, like writing an expense, that is really simple. Because it's simple, it might be tempting not have a specialized person do it and instead having every person do it on the need basis. But then, if it's done only rarely, people will have to learn it each time, or ask somebody how to do it, spending lot more time on it due to what are pretty much cache misses, and it would be more efficient to have a specialist do it, because then he would do it every day and had all the process corner cases in working memory. This is true, but it's important to remember that people aren't machines. Going too far down the division-of-labour route risks losing sight of what you're actually trying to achieve. Certainly in my case, that makes it a lot harder to perform my best, and it reduces the chance of spotting different ways to slice-and-dice the problem.
- thanatropism 8y agoBut every fashionable dev methodology (agile, XP, yadda) becomes a fashionable PM methodology in 3 to 5 years.
- rossdavidh 8y agoI was in an organization where they decided to cut the "indirect labor" cost, which for some reason included secretaries but not engineers. So, fewer secretaries means more of the tasks they used to do for engineers, the engineers now had to do themselves. So, instead of one secretary doing travel expense reports for a couple dozen engineers, and doing them efficiently and well, you had a couple dozen engineers who don't do it often enough to know how, doing it badly and over a much longer (and more highly compensated) time. Multiply this by many different kinds of administrative tasks.