> It's the exact opposite of YAGNI. It's attempting to build the ultimate end-all be-all up front. No wonder tunnel building is expensive, and all the projects
by jcranmer 8y ago
> It's the exact opposite of YAGNI. It's attempting to build the ultimate end-all be-all up front. No wonder tunnel building is expensive, and all the projects wind up huge and bloated.
The cost of making an incremental change to software is not appreciably different from incorporating the change in the first place. The same does not hold true for infrastructure; even a minor retrofit can end up being very expensive, especially if there was no provisioning for it. Look at the impact of the Rosslyn station on the DC Metro: the only practical solution to the capacity issue is to bore new Blue Line tunnels and a new underground station, which can't be had for less than ~$1 billion. Provisioning to solve this at the original system construction would have cost somewhere in the region of $300 million or so (there are other, much cheaper alternatives that can't be built with the current track geometry).
By saving $300 million, you're ultimately setting yourself to spend 3 times that much in the future.
> If a larger tunnel to Dodger stadium is needed, why couldn't it be dug below, with the old tunnel used to carry infrastructure for the new tunnel? That seems a solvable technical feat.
Undermining a tunnel is the easiest way to do this, but it requires closing the old tunnel to do. Digging a new tunnel immediately underneath an old tunnel is going to introduce different stresses on the old tunnel, which is going to be more of an issue if you're boring a parallel tunnel rather than a cross tunnel. Furthermore, all of the access points now have to go deeper to reach the new tunnel, which could introduce passenger circulation issues. It will also have passenger circulation issues during construction.
Maintaining access to existing infrastructure during construction is complex after all.
- stcredzero 8y agoDigging a new tunnel immediately underneath an old tunnel is going to introduce different stresses on the old tunnel So then dig the new tunnel beside it. Maintaining access to existing infrastructure during construction is complex after all. For many complex industries, there is innovation and cost reduction. Digging larger parallel tunnels is something that the industry should be making easier and cheaper, leveraging the existing infrastructure. The mindset that "tunneling is expensive" is exactly the kind of self-fulfilling prophecy which prevents such progress.
- jcranmer 8y ago> So then dig the new tunnel beside it. What if there are things in the way? Like... building foundations. Stations. Access to the first tunnel. Lots of stuff that might be reasonably expected to grow up in close proximity to a tunnel. Digging two tunnels at once is going to be much cheaper and easier than digging one tunnel and then digging the second tunnel much later, especially if you never planned to dig the second tunnel.
- stcredzero 8y agoWhat if there are things in the way? Like... building foundations. Then dig deeper. Given the strategies talked about by Elon Musk, the original Boring Company tunnel would have been dug to avoid those in the first place. Stations. Access to the first tunnel. Those wouldn't have right of way problems. Digging two tunnels at once is going to be much cheaper and easier than digging one tunnel and then digging the second tunnel much later, especially if you never planned to dig the second tunnel. Therefore, the logic is to dig everything you might imagine you might need, ever. Therefore tunnels are always going to be super expensive and elaborate.
- jcranmer 8y ago> Therefore, the logic is to dig everything you might imagine you might need, ever. Therefore tunnels are always going to be super expensive and elaborate. Not everything you might imagine you might need, ever. But everything you can reasonably forecast to need in the next 50 years. The thing about tunnels: tunnels aren't expensive, stations are (particularly the station mezzanines and the pedestrian circulation to reach them). A two-track subway line is only going to be ~30% more expensive than a one-track line, and a four-track line only ~50-60% more than a two-track line. And it doesn't take a genius to figure out which one you need: one-track lines are never a good idea, and four-track lines are only necessary for trunks in megacities. You can look at your demand and figure out if you're going to need to go to 8- or 10-car trains as your maximum train length. Not to mention that you also (as a city) have the ability to steer development to increase demand on your subway networks via tools like zoning. Insisting that you have to build only to minimal, current demand scenarios is being penny-wise and pound-foolish.