4 ms·
Once you have gotten plans on paper, and permits. And you are getting the foundation placed(or placing it yourself) make sure of all measurements, don't shrug a
by Freestyler_3 8y ago
Once you have gotten plans on paper, and permits.
And you are getting the foundation placed(or placing it yourself) make sure of all measurements, don't shrug away half a degree off. Same with levelling the walls.
This will save you a lot of cursing.
Also if you are going with concrete then the electrics will be poured in, make sure you put a lifeline in for some circuits. (this is a connection from the entry point to a different point in the circuit than the connection you already have) This could save a lot of work if something goes awry and you lose a connection.
insulation is good, but you don't want water condensation in between materials.