3 ms·
During a power crisis caused by a high tension cable breakdown Auckland depended on ship borne power. I'm pretty sure it was GE gas turbines. There is a well un
by ggm 8y ago
During a power crisis caused by a high tension cable breakdown Auckland depended on ship borne power. I'm pretty sure it was GE gas turbines. There is a well understood model for mobile power, I don't see why this model can't work and guy lots of use cases. Nuclear why not?
The loss of competence in nuclear engineering worldwide worries me. Do we need to start sending engineering grads to Brazil? Britain outsourced it's coming plants to China didn't it?