4 ms·
The point is not that the deps are problematic to track - that is to be expected with any larger project. The point is actually doing the tracking, and being aw
by pferde 8y ago
The point is not that the deps are problematic to track - that is to be expected with any larger project. The point is actually doing the tracking, and being aware when the deps change, new one gets added, etc., and being able to determine what it means for the business.