3 ms·
Nice work. From [2]: Cement manufacturing is highly energy- and emissions-intensive because of the extreme heat required to produce it. Producing a ton of ce
by mistermann 8y ago
Nice work.
From [2]:
Cement manufacturing is highly energy- and emissions-intensive because of the extreme heat required to produce it. Producing a ton of cement requires 4.7 million BTU of energy, equivalent to about 400 pounds of coal, and generates nearly a ton of CO2. Given its high emissions and critical importance to society, cement is an obvious place to look to reduce greenhouse gas emissions.
Ignoring the geographical problems, could using the power source from which energy is stored for these devices also be used to manufacture the concrete, or would you be constrained by the power plants ability to output enough energy intensity to produce concrete?
If feasible to do, then for the geography issue, would the CO2 output from lengthening the trucking route and/or high voltage transmission lines to the storage site possibly overcome the cement issue overall? If the power is ~free, loss in transmission is less important, but then you have to consider the output of manufacturing and installing transmission lines also. Although, perhaps there's spare capacity on some lines.
Actually, once the blocks are manufactured, you can ship them anywhere.
Complicated.
- CydeWeys 8y ago> Actually, once the blocks are manufactured, you can ship them anywhere. But you won't want to, because they're insanely heavy. At 35 tons a semi-trailer can only carry one. You really need to build these on-site. The amount of diesel you'd burn to move them long distance is astronomical.
- lenzm 8y agoIf you build it on site won't you still have to haul in all of the materials to produce it which will weigh more than the final product?
- CydeWeys 8y agoThe point is that they would be made locally, not "shipped anywhere". Every city has a bunch of local concrete plants for a reason. If I buy aggregate, it's coming from nearby; it's not being shipped across the country.
- bacon_waffle 8y agoNot necessarily. concrete = cement + aggregate; the aggregate might be quarried on site.
- mistermann 8y agoYou have to haul the materials to make cement in from somewhere though anyways, right? I know nothing about the cement business, so it's hard to have even a clue how to estimate this, even if you consider the power to be ~free..