3 ms·
It took 17 months to bore the 17 km City Tunnel train tunnel in southern Sweden. But the City Tunnel is actually two tunnels not one (+ cross-passages), it's 3
by kalleboo 8y ago
It took 17 months to bore the 17 km City Tunnel train tunnel in southern Sweden.
But the City Tunnel is actually two tunnels not one (+ cross-passages), it's 3 times longer, and has twice the diameter.
For the City Tunnel, the whole construction including 3 elaborate stations, all the traditional track infrastructure including 2 different signaling systems and connecting it to the existing rail took 5 years. That's probably the part the Boring Company is trying to save on, not so much the actual tunneling.