3 ms·
There can't actually be 2 crossrail trains per minute surely? Keeping the tube lines consistently running ~2 minutes apart is barely achieved... Like, I'd be
by Ntrails 8y ago
There can't actually be 2 crossrail trains per minute surely? Keeping the tube lines consistently running ~2 minutes apart is barely achieved...
Like, I'd be incredibly impressed if they pull it off - I'm just dubious.
- SideburnsOfDoom 8y ago> There can't actually be 2 crossrail trains per minute surely? Official docs actually say "A train every two and a half minutes at peak time through central London ... trains accommodating up to 1,500 passengers" http://www.crossrail.co.uk/route/ http://www.crossrail.co.uk/route/ So it looks like no. It will actually take crossrail 5 minutes or more to exceed that daily capacity of Dugout loop.
- tigershark 8y agoYou are right I didn’t remember correctly. Still 5 minutes to exceed the daily capacity of this loop is a quite good result I think.
- SideburnsOfDoom 8y agoI would say that crossrail will be much higher capacity than that, since it aims to have 41 stations and London is a big city, so there is potential for the same train to carry one group from Station A to Station D, someone else from station C to Station G, another group to replace the first from station D to station K, etc. Large networks are just more useful than ones with 2 nodes.
- jcranmer 8y agoMost subway lines will have peak scheduled throughputs of about 26-30 trains per hour, or a train every 2 minutes or so. The tracks can support more, but it's a good idea to have some schedule slack so you can send more trains through if things go wrong. Moscow's Metro does manage 45TPH, but that is achieved mostly by having a simplified track layout with no revenue branching.
- CaptainZapp 8y agoPrague's metro C has a 90 second interval during rush hour. I was always wondering about people running to get the next metro.
- Reason077 8y ago"Keeping the tube lines consistently running ~2 minutes apart is barely achieved..." The Victoria line has been quite successfully running 36 trains per hour (100 second headway) at peak times for the past year. Peak = about 3 hours each in the morning and evening.