3 ms·
I assumed he didn't pull permits because he said It cost me $100 in parts/wire -- nothing about permit fees. Because tenants, in general, don't have a long-ter
by Johnny555 8y ago
I assumed he didn't pull permits because he said It cost me $100 in parts/wire -- nothing about permit fees.
Because tenants, in general, don't have a long-term interest in the property and are willing to cut corners. Some things I've seen:
Switching 15A breaker for a 20A breaker "because it trips too much".
Wiring an extension cord into the panel and running it through a hole in the wall to the garage "because I needed another circuit (my grow lights kept tripping the other one)"
Swapping hot/neutral when replacing outlets
Using a wire nut that's too small and taping it to hold it in place.
Not using a wire nut at all, just twisting wires together and taping them.