14 ms·
Unfortunately it doesn't. Aluminum needs a lot of electricity, but it needs to be consistent for several hours. It takes a lot of energy true, but the furnaces
by bluGill 8y ago
Unfortunately it doesn't. Aluminum needs a lot of electricity, but it needs to be consistent for several hours. It takes a lot of energy true, but the furnaces need to be at operating temperature. You can't just turn them on and off, there are startup and cool down times that need to be accounted for.
- docker_up 8y agoCurrent furnaces do. But what if you changed the manufacturing process as well so that maybe the yield isn't as high but it's essentially "for free" in terms of electricity?
- mercutio2 8y agoWhat you’re proposing is synonymous with “let’s make unobtainium with our spare electricity!” If we could make anodes which weren’t destroyed by falling to a low temperature, we’d already be doing it.
- russdill 8y agoYou might be able to add a separate process where salt gets melted, stored, and used to heat furnaces.
- rstuart4133 8y ago> Aluminum needs a lot of electricity, but it needs to be consistent for several hours. Then Aluminium smelting is an excellent match for wind and solar. Quoting https://hal-mines-paristech.archives-ouvertes.fr/hal-00529986/file/paper_Billund_2003.pdf https://hal-mines-paristech.archives-ouvertes.fr/hal-0052998... "Typical numbers in accuracy are an RMSE of about 10- 15% of the installed wind power capacity for a 36 hour horizon."
- jmmcd 8y agoIf I understand right, that figure is measuring the accuracy of a prediction of electricity production, not the constancy of the production. We can't smelt aluminium with no power even if we have predicted that there'll be no power.
- rstuart4133 8y agoTo be honest I don't know, but I do know taking advantage unpredictable power of this sort is why Aluminium plants are built in the first place. Where I live they are paired with coal fired plants. The reason they are paired with coal fired plants is coal can't change it's output fast enough to match the somewhat unpredictable changes in electricity usage. So the coal plant needs someone who will buy power when it's cheap, and not use (much) when its expensive. Apparently an Aluminium smelter fits the bill nicely. I presume it uses enormous of amounts of power to disassociate the Al(OH)3 but needs only a small amount of power to keep the pots at operating temperature which is not particularly surprising as the pots can be thermally insulated. Maybe the above claim that Aluminium can't tolerate rapid changes in available electricity is true, but it sounds odd. Coal fired plants often "trip out" - meaning the generator drops off line without warning. This is an unpredictable change that happens much faster than the sort of unreliability we see from renewables - it's a huge change that happens in milliseconds. And it's not uncommon: https://leadingedgeenergy.com.au/coal-fired-generators-trip/ https://leadingedgeenergy.com.au/coal-fired-generators-trip/ Again, the Aluminium plants seem to cope with this extreme unreliability just fine.