3 ms·
> Building a rover that can drill more than a few inches deep is presently a huge technical challenge. You need a rover of 8x mass. 1- make a rover of standard
by pvaldes 8y ago
> Building a rover that can drill more than a few inches deep is presently a huge technical challenge. You need a rover of 8x mass.
1- make a rover of standard weight and size an put it in the desired place, as before. Deploy a light but strong flat platform around.
2-Look around. What do you see? Probably a lot of heavy rocks.
3-Pick some rocks of the appropriate mass, or a bag of sand
4-Load stuff of your choice over rover or put it in the flatform or in a special area designed to be filled until reaching the desired weight. Yes, like a truck.
5- Now that your rover is 8x heavier, start drilling
6- Finished?. Now remove the bags of sand or the rocks one to one.
- NegativeLatency 8y agoSure, but you now have all kinds of extra mass to lift to orbit (not the sand, but a beefier rover). You could launch more payloads and assemble in orbit. It starts to become complicated...
- pvaldes 8y agoI can't see why. After you remove the load again. Rover weight would be the practically the same as before. Maybe a little heavier, but not much.