Correct me if any of the maths below are wrong. Eagle Solar Mountain Solar Farm ( 300 MW ) will have an annual production capacity of over 900 million kilowatt
by ksec 8y ago
Correct me if any of the maths below are wrong.
Eagle Solar Mountain Solar Farm ( 300 MW ) will have an annual production capacity of over 900 million kilowatt hours (kWh) once completed. The Moapa Band of Paiutes has become a national clean energy leader and will host in excess of 600 MW of solar on the 72,000-acre reservation. [1]
For example, the Topaz Solar Farm [3] has an annual production capacity of 1200 million kWh on 25km2. Around ~6200 acre.
This seems an awful a lot of space for low capacity generation? I know it is reserved, but that is like 10x the size difference, why aren't they building more?
US annual electricity consumption is 4,015 billion kilowatt hours in 2017, 60% coming from fossil fuel [2].
For solar energy to replace that 60% energy consumption; 2409 billion kWh, it would require 2000 Topaz Solar Farm, or 50,000 km2, or slightly less the fifth of Nevada area.
The cost of the 300MW Eagle Solar Mountain Solar Farm is roughly $2B, assuming it would cost $3.6B to build the size of Topaz Solar Farm which is 550MW, it would take $7.2 trillion to build a 60% US needed solar farm, ignoring the benefits of Economy of scale, and any improved efficacy of solar panel.
Given all the benefits of Solar, being cheaper then Coal, I am surprise it is still only 1.6% of US electricity generation. Why is that?
[1]https://www.businesswire.com/news/home/20180531006155/en/8minutenergy-NV-Energy-Announce-Largest-Solar-Project https://www.businesswire.com/news/home/20180531006155/en/8mi...
[2] https://www.eia.gov/tools/faqs/faq.php?id=427&t=3 https://www.eia.gov/tools/faqs/faq.php?id=427&t=3
[3] https://en.wikipedia.org/wiki/Topaz_Solar_Farm https://en.wikipedia.org/wiki/Topaz_Solar_Farm
- philipkglass 8y agoThe $2 billion in the article you linked seems to refer to NV Energy's "latest tranche of renewable projects totaling over 1 gigawatt." The cost of the Eagle Solar Mountain Solar Farm does not appear to be broken out specifically in that article. The Moapa Band of Paiutes is presumably not dedicating most of their reservation's land to solar generation. Most of the Topaz Solar Farm's land is dedicated to solar generation. That's why you see a much lower energy density if you're calculating areal production using the entire land of the reservation as the denominator. Solar has become cheaper than coal quite recently. It takes time to build new projects. The "cheaper than coal" qualifier is also so far true just in areas with reasonably good sun resources. Much of the US population lives in areas where there's not enough sun for PV to be cheaper than coal. New York and Pennsylvania aren't there yet, for example. Finally, the US federal government is trying to prop up the coal industry. That includes invoking "national security" to keep uncompetitive coal plants running. The present administration has also raised the prices of solar equipment with a slew of tariffs. There's a risk for project developers that they could submit a bid for a new solar project, sign a contract, and then a year later see their costs rise above profits due to another round of tariff fights. There's a risk for project buyers that they'll lock in an agreement for a new "cheaper than coal" solar project but be forced to keep buying coal power anyway due to outside forces. For example, Arizona's excellent sun resources now make PV generation significantly cheaper than running a 1970s-era coal plant in the state, but the federal government may try to force the coal plant's old customers to keep buying its electricity: https://www.reuters.com/article/us-usa-coal/us-interior-department-weighs-plan-to-save-navajo-coal-plant-from-closing-idUSKCN1J22UC https://www.reuters.com/article/us-usa-coal/us-interior-depa...
- ksec 8y agoI see. Sorry I don't follow much US politics. I know Nevada are basically a desert, which is perfect for Solar Panel and electricity, does the Federation nature, forbid a super scale Solar Farm in Nevada to power the rest of US? And who owns the grid in US? Government?
- philipkglass 8y agoThe United States has multiple regional grids, operated by organizations called RTOs or ISOs (Regional Transmission Operators, Independent System Operators). Components of the grid, including transmission lines, may be owned by government agencies or by private companies, though private companies are more common. As I mentioned in another comment, the hardest part of building big interstate transmission projects in the US is getting approval from every state and land owner between two distant points. 4 out of 5 involved states can approve a plan quickly but then the plan can languish for years trying to get approval from the 5th state involved. Long distance transmission projects do get built, but they generally take a long and uncertain time to reach approval. That's one of the factors that prevents sunny states from just exporting solar power to less sunny, more densely populated states. The other big factor is that these big infrastructure projects are also expensive to construct, but in my opinion it's the delays and uncertainties that are the bigger obstacle.