3 ms·
Wish we had news on the Pebble Bed stuff.
by ggm 8y ago
Wish we had news on the Pebble Bed stuff.
- Animats 8y agoWell, Mammoet, the heavy-lift company, was able to move the jammed German pebble bed reactor to a new location where it can cool down for 60 years or so until somebody figures out how to dismantle it.[1] [1] https://www.mammoet.com/cases/avrjulich/ https://www.mammoet.com/cases/avrjulich/
- ggm 8y agoThat's quite some clusterfuck.
- Animats 8y agoEvery reactor design which had something mechanically or chemically complex going on inside the radioactive zone has had major problems. Pebble bed reactors jam. Sodium cooled reactors have fires. Helium cooled reactors have leaks. The interior environment is hostile, unmaintainable, and has to work for decades. That's why we're stuck with water-based reactors.
- jabl 8y agoWell, yes and no. Basically LWRs are good enough for the time being. When/if there's a major expansion of nuclear power, we'll need breeders and reprocessing, but right now there's no pressing need. Right now what nuclear power needs (from the technical POV) is to reduce the time and cost of construction. Which, most likely, won't happen by introducing new and unproven reactors and fuels.
- Ygg2 8y agoThe link indicates Mammonet moved a reactor built in 1950. Are you sure it is related to pebble bed design at all?
- ggm 8y agoYes. its the original design model which subsequently moved to China. I don't doubt the design flaws which were in the 1950s model have been overcome, but man. The Strontium90 burden.. thats one sick sad story.
- kalleboo 8y agoI don't know why that article says it was built in the 50's, it was built in the 60's https://de.wikipedia.org/wiki/AVR_(Jülich) https://de.wikipedia.org/wiki/AVR_(Jülich)