5 ms·
> dropped in a motion controller card and went to town Perhaps we were working on systems of a different scale. Most of the facilities I controlled had on th
by pdx 16y ago
> dropped in a motion controller card and went to town
Perhaps we were working on systems of a different scale. Most of the facilities I controlled had on the order of 2000 - 5000 I/O points and stretched over several multistory buildings. It sounds like you're doing motion control of a pick and place machine or something similar. That's also fun, especially now that you can do so much with optical recognition.
- stonemetal 16y agoYeah we mostly did smaller systems. On bigger jobs we tended to do it as several smaller systems working together. The largest system we ever did was a several hundred I\O points but that was over maybe 20 systems(we did all product movement between machines in the place.)