2 ms·
My mental model was that ideally it is a greedy algorithm for job shop scheduling (dev time) with dt = two weeks and a horizon as long as your backlog. The bigg
by salty_biscuits 8y ago
My mental model was that ideally it is a greedy algorithm for job shop scheduling (dev time) with dt = two weeks and a horizon as long as your backlog. The biggest and most common failure mode I saw was having a bad product owner (it can be a single point of failure, devs have a team to help them out).