3 ms·
Scrum didn't rename any of them. They added the roles of scrum master and product owner but those are roles that can be assigned to people with traditional titl
by tootie 8y ago
Scrum didn't rename any of them. They added the roles of scrum master and product owner but those are roles that can be assigned to people with traditional titles in addition to their normal roles.
- blub 8y agoThe scrum master and PO should explicitly not also be the PM, there's a huge conflict of interest.
- tootie 8y agoPM can be scrum master. I've done it plenty of times. The entire scrum team should be aligned around the same objectives so a conflict of interest is not possible. The PO is outside the team and is the only one who should avoid wearing multiple hats.