4 ms·
Because without the ability to machine it, you have far less of an insight into how hard it will be to do so, or how long it will take, or how much wastage ther
by gaius 16y ago
Because without the ability to machine it, you have far less of an insight into how hard it will be to do so, or how long it will take, or how much wastage there will be. That can have an orders-of-magnitude effect on the cost. In your story, Chuck is ordering parts sure, but the guy who designed those parts was a specialist in designing parts...
In my first year of Mech Eng they sent us all off to a machine shop to learn to weld, use a lathe, etc, I couldn't give an example to you now, but it really does make a difference, you start to think as well as "how will this work" but also "how will this be made", "how can this be repaired", "how will someone get at this part to replace it", etc etc.
- joe_bleau 16y agoExactly. I can't tell you how many times I've heard my dad (a lifelong precision machinist) complain about the quality of drawings from CAD jockeys that have no clue about machining processes.
- redrobot5050 16y agoThis is like saying that Apache is a bad web server because IT people complain to the System Architects over how hard it is to harden it for PKI and use in Top Secret Environments. Odds are the IT monkey doesn't know what he is talking about anymore than the lathe monkey. Both have a false sense of expertise because they see their field as "equal".
- joe_bleau 16y agoI doubt you'd call a tool and die man a "lathe monkey" if you had much experience in the chip making world.
- redrobot5050 16y agoare we talking about integrated circuit chips? Because everyone in the EE/SOC world mocks the VLSI monkeys. Its a $120/hour CAD jockey job. It's an entirely different skillset and mindset to adapt an ISA to hardware than is to make sure there's no overlap.
- gaius 16y agoAn architect who isn't also a hands-on practitioner is making decisions based on nothing more than the vendor's advertising. Remember that.
- redrobot5050 16y ago>In your story, Chuck is ordering parts sure, but the guy who designed those parts was a specialist in designing parts... Exactly. In the long run, re-inventing the wheel is costly. Costly enough that Chuck graduates with his PhD, while the other ends up failing out and working at a machine shop. Also, a constant criticism of Chuck's counterpart, Mike, was that everything he built was constantly over-engineered, and took to damn long. If anything, his machine shop experience hampered his ability to design or refine his design skills past an undergraduate level. A semester of welding, lathing, and whatnot will likely not help a professional MechE, as easily half their CAD designs will be fabricated completely by machine. Understanding a precision machinist's complaints will not come into the field.
- nickpinkston 16y agoNothing is "fabricated completely by machine" like an ink jet prints on paper. I work in 3D printing, the closest to this fire-and-forget model, and there are still a lot of design contraints and optimizations that any engineer needs to know to be truly good at making parts. If you're designing shaping, molding, machining, etc. parts having an idea of manufacturing processes is essential to elegant solutions at low cost. The other way would be like an artist who instructed someone to paint his masterpiece from his initial sketch. A lot is lost in translation.
- gaius 16y agoA semester of welding, lathing, and whatnot will likely not help a professional MechE Real, actual mechanical engineers think otherwise.