Wait, they've spend 1.5 billion dollars for 30 miles of train? That's only 50 million per mile! Most city light-rail projects in the US are 150 to 200 million
by forrestthewoods 8y ago
Wait, they've spend 1.5 billion dollars for 30 miles of train? That's only 50 million per mile!
Most city light-rail projects in the US are 150 to 200 million per above-ground mile. https://www.citylab.com/transportation/2018/01/why-its-so-expensive-to-build-urban-rail-in-the-us/551408/ https://www.citylab.com/transportation/2018/01/why-its-so-ex...
- ggg9990 8y agoThat’s what privatization can get you. They’re probably not paying some union “inspectors” $70/hr to sit around playing poker.
- dx034 8y agoNo, that's what existing infrastructure gets you.
- yardie 8y agoThe track was already there. $50mm/mi is just new stations, trains, and signaling.
- zaroth 8y agoAnd they still don’t have signaling that qualifies for going >= 80mph. I don’t get it?
- makomk 8y agoThey're using existing tracks and stations, as I understand it. So they basically managed to hit a third to a quarter of the cost of actually building a new rail line without building anything.
- _delirium 8y agoIt's quite a bit cheaper than that per-mile for the existing segment. Not sure where the above poster got "30 miles" from, since there are already 70 miles of track in service (Miami-W. Palm Beach). The $1.5 billion figure is for upgrades to the entire existing Miami-Cocoa corridor, which is 200 miles, so about $7.5m per mile in upgrades. Another $1.5b is budgeted to construct the new 40-mile line from Cocoa to Orlando, so that'll be $37.5m/mile for the new-construction portion if that comes in on-budget (remains to be seen).