3 ms·
Germany has at least one example of an aluminium producer testing dialing the power use of their melter up/down by 25% in response to input from the grid [1]:
by vidarh 9y ago
Germany has at least one example of an aluminium producer testing dialing the power use of their melter up/down by 25% in response to input from the grid [1]:
> Trimet says that implementing its technology across Germany’s four aluminum smelters, three of which it owns, could provide a demand response capacity equal to a third of Germany’s 40 gigawatt-hours of pumped hydro storage.
There was a lot of confusion about this one when it was published, but as the article points out, they're not using their molten aluminium pools as a liquid battery - they're merely dynamically adjusting the electricity usage of their hydrolysis cells, which also requires some other adjustments to keep the process going, but it's still a lot of power and more responsive than what they do today (which involves taking the smelters entirely offline for short periods).
It helps that their test plant is near Hamburg in the North, "close" to most of Germany's wind turbine capacity which helps alleviate transmission/interconnection problems to the South.
[1] https://www.greentechmedia.com/articles/read/german-firm-turns-aluminum-smelter-into-huge-battery#gs.aOAMAos https://www.greentechmedia.com/articles/read/german-firm-tur...