3 ms·
good pint about team size. I'd think it may not apply so much with huge teams, as if you probably need to have a very extensive definition of the problem to ju
by toss1 9y ago
good pint about team size.
I'd think it may not apply so much with huge teams, as if you probably need to have a very extensive definition of the problem to justify a large team at the outset, so doing the long-term architecture & design up-front (vs. a throw-away version) would likely be best.
I'd hope for a situation where the initial small team built the throw-away, ran it hard, then use that knowledge to build the big version and the big team.