>The $14.2 million project was designed as a cable-supported bridge by MCM and Figg Bridge Design. Figg was hired to design the replacement for a bridge on I35
by giarc 9y ago
>The $14.2 million project was designed as a cable-supported bridge by MCM and Figg Bridge Design. Figg was hired to design the replacement for a bridge on I35 in Minnesota that collapsed in 2007 and killed 13 people.
1 paragraph later.
>“In our 40-year history, nothing like this has ever happened before,” Figg said.
EDIT - As others have pointed out... I misread these statements.
- kldavis4 9y agoThey were hired to design the replacement, not the one that collapsed.
- maxerickson 9y agoThey designed the replacement that was installed in 2008. The bridge that collapsed was designed by a different company in the 1960s. https://en.wikipedia.org/wiki/I-35W_Mississippi_River_bridge#Design_and_construction https://en.wikipedia.org/wiki/I-35W_Mississippi_River_bridge...
- giarc 9y agoOh I see... I've edited my comment.