It was well known when I did civil engineering in the mid 90s, I want to say that it was post Northridge that it started to bubble through the code. 50 years i
by wiredfool 9y ago
It was well known when I did civil engineering in the mid 90s, I want to say that it was post Northridge that it started to bubble through the code. 50 years is probably pre-foundation tiedown. Current construction is going to have long sheet metal straps or j bolts into the foundation, I'm not sure what a retrofit will have.
An easy thing to check is the hot water tank. If it's not well strapped to studs, then I can't imagine anything else has been done. If it has, then at least you know that has been done, it it doesn't really tell you anything else.
I know when I was selling my house in Wa, that was one of the things the inspector looked for, so it's highly probable that it's been done, as its quick and easy.
Inspections are the only way to know for sure, but it can be invasive to get into the walls enough to see.
- shostack 9y agoThanks for the info. Water heater has two metal straps to the studs and is on a raised platform, so that's taken care of. The foundation is slightly raised on post and pier with no sheering panels or bolts in the posts that I can see, but the exterior walls look like they may be bolted to concrete the foundation perimeter. Any tips on making sure a retrofit company is legit? My biggest concern is I'd heard that the inspections for getting a retrofit aren't super consistent or thorough, which is a huge concern.