3 ms·
ETCS is designed for incremental rollout and upgrade of the levels. And they require less equipment on the track too since things are mostly done wirelessly, le
by the8472 9y ago
ETCS is designed for incremental rollout and upgrade of the levels. And they require less equipment on the track too since things are mostly done wirelessly, level 2 doesn't require signals, level 3 doesn't even require balises.