4 ms·
TBMs are designed at a specific diameter, for the kind of soil to bore through, wear down quickly, and aren’t easily moved. It often isn’t worth it to take apar
by Someone 9y ago
TBMs are designed at a specific diameter, for the kind of soil to bore through, wear down quickly, and aren’t easily moved. It often isn’t worth it to take apart a TBM and reconstruct it elsewhere, even if you could find a customer wanting a tunnel of the same width through similar soil.
For long tunnels, it isn’t uncommon to have two TBMs that meet in the middle and are abandoned there (they bore a side tunnel long enough to contain the TBM, and the side tunnel is closed behind them)
For example, see https://untappedcities.com/2017/02/09/the-200-ton-tunnel-boring-machine-buried-below-park-avenue-used-for-east-side-access/ https://untappedcities.com/2017/02/09/the-200-ton-tunnel-bor...:
”Burial of such a large machine was unprecedented in New York City, but is common practice abroad, reported the New York Times in 2011. The Spanish contracting company working on the project deemed it would be more cost effective to leave Seli in place. It was estimated that removal would cost millions and cause delays in existing construction projects. Dr. Michael Horodniceanu, the president of MTA Capital Construction, estimated at the time it would cost $9 million to remove Seli, which had cost somewhere between $6 to $8 million new.”