How Sweden is building the world’s second-longest road tunnel
- nstom 9y agoWith just 16km, this is not by any stretch going to be the world's second-longest tunnel, just the world's second-longest road tunnel. The longest tunnels are rail tunnels, which measure up to 57km (Gotthard base tunnel), and if you count subway tunnels the longest is Guangzhou metro line 3 with 60km. (https://en.wikipedia.org/wiki/List_of_long_tunnels_by_type#Under_construction https://en.wikipedia.org/wiki/List_of_long_tunnels_by_type#U...)
- ttkari 9y agoThe page you linked also lists tunnels built for water distribution, the longest of which is the Delaware Aqueduct at 137 km.
- vermontdevil 9y agoAnd they are building a bypass of 2.5 miles but will take total of 8 years. All so they can fix major leaks in the current aqueduct. Fascinating project.
- maljx 9y agoThere's one tunnel in each direction, the video mentions the total tunnel distance as 50km.
- cup-of-tea 9y agoThe Channel Tunnel has three tunnels, which total ~150km then.
- isostatic 9y agoWith the middle one being a 50km road tunnel, albeit not publicly accessible.
- sctb 9y agoWe've updated the headline here to clarify. Thanks!
- germainelol 9y agoi remember every time i went on line 3 for several stops, i thought to myself "damn, this is a long tunnel"
- Sharlin 9y agoAnyone have insight into different tunnel-building technologies? In particular, when is a boring machine a more appropriate solution than drilling-and-blasting?
- masklinn 9y agoTBMs are way more expensive up-front but allow little to no disturbance of the surroundings, and can produce smooth walls & line it as they go. TBMs can also bore in soil or sand. Aside from disturbance and raw feasibility (not sure you can D&B underseas) the main split point is going to be the length of the tunnel. TBMs mean large up-front fixed cost but have a lower price per distance and higher time efficiency, so D&B is more suitable for shorter tunnels (how short will also depend on the diameter you need). That aside, TBMs are awesome, I got to visit one as a kid (the operator gave tours of the TBM during the few weeks of work prep' before digging actually started in earnest) and it was a great experience, they're impressive bits of machinery & technology.
- dmurray 9y agoWhy is the upfront cost bigger for TBMs? If the TBM can be used on any length of tunnel, can't you resell it afterwards, or rent it instead of buying?
- CompelTechnic 9y ago(just a guess) even if you are only using it for a small fraction of its lifetime, you are amortizing the cost of a large piece of capital equipment, so the upfront cost must take this into account. Blasting has a smaller investment in capital equipment (even if amortized similarly) There is also the setup- carting in the pieces of the TBM and getting them into place, etc.
- masklinn 9y ago> Why is the upfront cost bigger for TBMs? Because a TBM itself is a large capital investment. A small TBM (~7m diameter) is ~10m€, a large TBM probably reach 100m€. This is money you have to pay upfront before the TBM even reaches the dig. The capital investment of D&B is a (few) jumbos which are cheaper (even large and expensive jumbos are unlikely to breach 2m€ brand new), more flexible (they're also used in mining operations) and less dependent of the manufacturer — thus easier to rent or buy used. > can't you resell it afterwards, or rent it instead of buying? The "back end" (gantries) can be sold back to the builder and refurbished, the "front end" (shield and cutter head) is thrown away (some are used as monuments) or recycled: https://www.herrenknecht.com/en/services/global-services/tbm-refurbishment.html https://www.herrenknecht.com/en/services/global-services/tbm... That's still expensive as hell, and you've still sunk the money in until the builder has examined and bought back the gantries after the project has ended.
- ajeet_dhaliwal 9y agoNot explained is how environmentally (the reason for building a tunnel instead of a bridge) is better.
- Sharlin 9y agoSure it was. It preserves the current environment which is preferable from both aesthetic and ecosystems point of view.
- ajeet_dhaliwal 9y agoOn the surface, what about the long term effects of boring giant holes and tunnels through underground?
- jopsen 9y agoProbably most of it is rock, and the tunnel is probably sounded by concrete. Regardless, I have no doubt the Swedes did an analysis and weighted the pros and cons.
- jimstr 9y agoThere was a previous Swedish tunnel project that had a number of incidents, among others groundwater pollution caused by a new sealing compound that contained acrylamid https://en.wikipedia.org/wiki/Hallands%C3%A5s_Tunnel https://en.wikipedia.org/wiki/Hallands%C3%A5s_Tunnel
- tontonius 9y agoWhat about the aesthetics and ecosystem of the bedrock? Are we suddenly caring more about living things than inanimate objects?
- Sharlin 9y agoYes, in general we do.
- speps 9y agoAnd the longest road tunnel is in Norway: https://en.wikipedia.org/wiki/L%C3%A6rdal_Tunnel https://en.wikipedia.org/wiki/L%C3%A6rdal_Tunnel
- Gustomaximus 9y agoThat seems cheap at $5million USD per km. I think I've heard of roads and train tracks aline being more expensive.
- hansjorg 9y agoSurprisingly cheap. There's recently been a scandal unfolding in Norway where the parliament has been building a 250 meter long tunnel into its parking garage. Almost exactly 1/100th the length of the Lærdal Tunnel. So far this project has cost 2.3 billion NOK, or 1.3 billion more than the Lærdal Tunnel. That comes out to 1180 million USD per km. (To be fair, included in that price is also the renovation of a building external to the parliament).
- digi_owl 9y agoAnd yet the government fret like crazy over every KM of road being built (unless it is from Oslo to Kristiansand), to the point of using foreign companies with downright insane lack of safety protocols (liquid explosives stored right next to a propane heater!).
- chha 9y agoAnd even this will be outdone by a new one they just started building, which will be the longest and deepest. https://news.ycombinator.com/item?id=16560951 https://news.ycombinator.com/item?id=16560951
- speps 9y agoAwesome, I added some links to your submission.
- henrikschroder 9y agoWow, it's pretty fun to read a completely positively spun article about something that's been heavily criticized locally. The highway in question has been a weird-ass pet project since the 60's. It's been routinely denied and shelved many times, but after Stockholm implemented congestion tolls in 2006, it had a resurgence. Originally it was all aboveground and bridges, but the reason it's now morphed into the longest road tunnel project in Sweden, is because the response to every small NIMBY protest has been "fine, we'll dig it down, but it'll cost more". Note that it's still aboveground in some places, and in something that I'm sure is pure coincidence, those areas are among the least affluent residential areas of Stockholm. Note that everyone living above the tunnels will still get to enjoy years of underground rock blasting, I'm sure that'll be fun. And since almost the entire highway is now in a tunnel, and since it's going to be the longest in Sweden, the budget has gone up dramatically. How to finance it? Oh, our glorious politicians decided to use money from the congestion tolls. Never fucking mind that the initial promise of those were that the funds were going to be used solely for public transportation projects and improvements - things that would actually solve congestion. But all of that is now put on hold for the next 10-20 years, because this one road eats all the budget. Yet another criticism is that the highway doesn't really solve the problem, because there's actually very little existing traffic that goes between the points it will connect. Truck transports from the south of Sweden to north of Stockholm take different routes already, they don't go through Stockholm. So you won't get rid of all the heavy traffic that's currently congesting the E4, because most of that is actually going into or out of Stockholm. All the ports of Stockholm are over on the east side of the city. Yes, if you live in the far west suburbs of Stockholm, you now get an easy way of going to the southern suburbs, good for you, but that's going to increase total traffic, not decrease it. But the most annoying thing about the project is that in this latest round where a ton of challenges forced it underground into tunnels, which resulted in significant increases in cost and time, noone has re-evaluated what the traffic situation in Stockholm is going to be like in 2026 when it's estimated to be completed. (Note: Of course it won't be completed in time or on budget, so 2026 is highly optimistic already). Here on Hacker News there's regularly articles about our glorious new electrically powered autonomous rideshare future of transportation, but this highway project doesn't take any of that into consideration. They're just assuming that traffic will increase like it has the past few decades, they're assuming it's going to be 100% ICE-powered human-driven cars. And yet you have articles like this which heaps praise on the environmental concerns and solutions of yet another ridiculously expensive highway that noone really needs or wants.
- zeristor 9y agoDon't forget the Norwegian ship tunnel too: https://en.wikipedia.org/wiki/Stad_Ship_Tunnel https://en.wikipedia.org/wiki/Stad_Ship_Tunnel
- kartan 9y ago> "The harder and stronger the rock is, the quicker we advance."... I like how counter-intuitive is this statement. I used to live in a place where the soil was part of a river delta. It was really easy to drill but impossible to keep the tunnel in place and free of water. And it sometimes just sinks the above-ground facilities: https://www.20minutos.es/fotos/actualidad/24-horas-en-fotos-3169/4/ https://www.20minutos.es/fotos/actualidad/24-horas-en-fotos-... > ..."Drilling and blasting isn't so time-consuming, but sealing the rock from water leakage is. If the rock is very fractured, we need a lot of concrete sealant or reinforcement columns to ensure integrity," said Brantmark, describing the work of the three Atlas Copco Drill machines in use. Now I live in Stockholm and it's pure rock. These are pictures from the subway: https://www.boredpanda.com/stockholm-metro-art-solna-centrum/ https://www.boredpanda.com/stockholm-metro-art-solna-centrum...
- black_puppydog 9y agoI lived in Solna for half a year, then Tyreso and Lappis for my studies. Do you know if the blue line stations also used this kind of sealing, or is that something new they're doing?
- Tuna-Fish 9y agoYeah, this is why there is constant talk of a tunnel connecting Helsinki and Tallinn and/or Stockholm and Turku. The distance is much more than the channel tunnel, and the population that would use it is much less, but it might still be feasible simply because it could be routed almost entirely through hard granite. In Helsinki a lot of the kind of infrastructure that is placed above ground basically everywhere else is being dug underground simply because the cost of digging is less than the cost of land, and so everything that doesn't need windows gets sunk in the rock. And when you dig, you actually get to recoup some of your expenses by selling the stone you quarry...
- bjourne 9y agoThat's by the way the reason there are so many tunnels in Stockholm but very few in Göteborg. It is very easy (relatively speaking) to dig tunnels through granite but very hard through muddy sediment. Some tunnels are still being dug in Göteborg but they are much more expensive than in Stockholm. Nowadays, one of the main problems of digging in Stockholm is that there are already so much stuff dug out that it is hard to find room for new tunnels!
- tristor 9y agoThis brings up the question of whether or not there's a good list of long road tunnels you can drive through? I'd love to cruise through one of these bouncing off the rev limiter, just for the fun of it :)